An old auto body shop is the area of our next project.
Look at the size of that rebar!
The masons are working extra hard to complete the elevator shaft so that steel can be put up on schedule.
After the elevator shaft was completed, steel was immediately delivered and put up.
The masons did another great job with the mockup panel. This is what the walls will look like when the project is completed!
Before, there was offstreet parking to the left of the building that was a waste of airspace.
We utilized that space by putting an side building addition with a two car garage on floor level.